Pre-feasibility Study on Coal Mine Methane Recovery and Utilization at Komsomolets Donbassa (KD) Mine in Donetsk, Ukraine (September 2013)

View

Sector:Coal Mines
Year:2015
Language:English
Format:PDF

The principal objective of this pre-feasibility study is to assess the technical and economic viability of drilling vertical pre-mine drainage wells and surface gob wells at the Komsomolets Donbassa Mine, and using this gas to produce electricity.