Case Study Thumbnail

Taking Proactive Steps to Mitigate Methane and Commit to Sustainable Solutions

View Case Study

Summary

The Metropolitan Utilities District is replacing 370 miles of cast iron infrastructure with high-density polyethylene pipe to reduce leaks, eliminating the equivalent of more than 6,600 metric tons of carbon dioxide per year.

Partners

  • Metropolitan Utilities District
  • U.S. Environmental Protection Agency (U.S. EPA)

Global Methane Initiative (GMI)
Leading methane action since 2004