|
Project Information
|
Stage
|
idea
|
Sector
|
idea
|
Geographical Focus
|
China
|
Location
|
Southeast Heilongjiang province
|
Description of Project
|
The Jixi Coal Mining Group (JCMG) requires assistance enhancing the drainage and recovery of fuel-grade methane from multiple coal seams at 600 to 1,000 meters below the surface. JCMG will also install 13 MW (26×500 kW) Shengdong internal combustion engines fueled by CMM from the Jixi coal mine.
|
Instrumental Organizations
|
Texas Transportation Institute, U.S. Environmental Protection Agency
|
Emissions reductions:
(MTCO2E)
|
340,000 tonnes CO2e per year
|
Results and Outcomes
|
|