|
Project Information
|
Stage
|
Ongoing
|
Sector
|
Ongoing
|
Geographical Focus
|
India
|
Location
|
Ahmedabad at the Pirana landfill.
|
Description of Project
|
2007-The U.S. EPA met with municipal officials and collected site data to evaluate the technical feasibility and the institutional and political framework of capturing and using methane gas at the landfill. The site was selected for a pump test evaluation.
|
Instrumental Organizations
|
Texas Transportation Institute, U.S. Environmental Protection Agency
|
Emissions reductions:
(MTCO2E)
|
824258 for 2009 until 2022 (average of Scenarios 1 and 2)
|
Results and Outcomes
|
The pre-feasibility study and landfill site-specific data will be shared with the Partnership and Project Network to identify project development and financing support.
|